JIVO Energy has successfully installed a 3.5 MW Rooftop Solar PV system at a Bottling plant in Harare, Zimbabwe.
The project involves the Engineering, Procurement and Construction (EPC) of a 3.5 MWp rooftop Solar PV plant for Varun Beverages (Pepsi bottling plant).The Project was completed in October 2023.
Technology
Rooftop Solar PV - Grid-Connected
Client
Varun Beverages
Capacity
3.5 MWp
Year of Completion
2023